Studio 2
July 28th Cabinets are built. The one at left bottom is the sinkbase. Bottom right is frame for the island.
Drawers, space for mini fridge, sink base.
The island is not in its place yet. Where Miffy is going, there will be  16x20 box frames, 10 on each side. To the right will be the five huge drawers  that are stacked on top at the moment. They will hold sheets of exotic paper.
Back to Studio 1
The window has a frame and a sill....
A new vantage point for keeping an eye on birds and squirrels!
Stained Glass window is picture framed in place.
And there's a door!
August 2 the Corian top is placed on the island by the pirate and Rob.
The little white thingie under the window is a hole for the laptop and phone cords to go through.
The sink and fridge are in place. Guess this is why the electrican labeled the circuit breakers "Kitchen #2". The sink won't be hooked up until Monday the 4th, though. The fridge is full of snapple, diet coke, oh and a couple bottles of wine. Well, the kitchen fridge was SO overcrowded...
Even my 24 x 36 cutting mat can go in one of these drawers!